Visit our website:

Tuesday, August 30, 2011

How to install a 15,000 Lineal Foot ceiling

Here is a progress update on the installation of the custom ceiling at the Oregon Coast:

(Step 1) Create insanely complex shop drawing

(Step 2) Install 2 x 4 furring strips milled to exact tolerances.



(Step 3) Hang fabric between furring strips.


(Step 4) Sort through material and find best matches.



(Step 5) Start installing—proceed with caution.


(Step 6) Keep going.


(Step 7) Make crazy concealed flipper doors where access is needed.


(Step 8) Admire how crazy flipper doors close and completely disappear.



(Step 9) Scribe fit around steel columns.


(Step 10) Do this for about 5 months, until complete. (To be continued.....)