Visit our website:

Showing posts with label Construction. Show all posts
Showing posts with label Construction. Show all posts

Tuesday, May 24, 2011

RN-74 Communal Table

Here are some pictures of the RN-74 communal table in process.


The table is made up of solid walnut planks with brass inlay—after we install the brass, we scrape it flush to the wood— you can see the brass shavings mixed in with the walnut. This was very, very satisfying.


Detail shot of the brass after it is scraped flush.


Here are the two halves ready for final assembly. We are installing a solid brass block between the halves. The final dimensions are 43" wide x 12' long.

Monday, April 26, 2010

Li Ning Phase Two, Foyer Display

This is one of the pieces we are making for the new Li Ning store, in process:


Brian working on the foyer display box.



Drilling holes for the aluminum posts.



Preparing to route for the light channel: Note the company required tattoo!



On Site: Wall is prepped for the installation.



The completed display is installed.



Jeff checking for proper alignment. Next up, drywalling!

Thursday, March 4, 2010

LI NING: PHASE TWO

We are in the process of building out Li Ning's second retail location. Once again, curves, curves, and curves!

Brian working on the customer counter. 11.5 feet long!


Tim drilling cord chases in the display box tops-- the level helps him guide the bit so he doesn't blow out the side.


Jeff trimming the edge-banding for the bamboo display boxes.